雙組份打膠機安裝順序是怎樣的?

瀏覽:0
雙組份打膠機安裝順序是怎樣的?這一問題是很多人都想知道的,下面小編就來為您講講。
What is the installation sequence of two-component sealant dispenser? This is a question that many people want to know, and the following small compilation will tell you about it.
1、雙組份打膠機設備應安裝在干燥、無粉塵、無腐蝕性氣體的壞境中(該要求與其他設備一致,當然如果條件達不到少爭取無腐蝕性氣體,畢竟設備中有電線以及管路這些配件抗腐蝕性不高)。
1. The two-component sealant dispenser equipment should be installed in a dry, dust-free and non corrosive environment (this requirement is the same as that of other equipment. Of course, if the conditions cannot be met, at least try to avoid corrosive gas. After all, there are wires and pipes in the equipment and these accessories have low corrosion resistance).
2、室內溫度更好控制在10~40度的室內堅硬地面上,地面應水平度要好。(小編這里說的地面水平度要好不一定要非常的平整才行,我們的設備在設計之初已經考慮到了地面復雜性的因素所以對地面平整度是有相當大的忍讓度的,只要不是幅度提別的大一般都可以正常工作。)
2. The indoor temperature should be better controlled on the hard indoor ground of 10~40 degrees, and the ground should be better leveled. (The ground levelness mentioned by Xiao Bian here should not be very smooth. Our equipment has taken the complexity of the ground into consideration at the beginning of design, so we have a great tolerance for the ground levelness. As long as it is not greatly improved, it can generally work normally.)
雙組份打膠機
3、雙組份打膠機安裝之前,應先檢查是否有因運輸、搬動造成的變形、損壞和緊固件松動情況,之前就曾經有客戶在移動打膠機的過程中把設備的智能控制系統的一個零部件碰掉了而導致設備無法正常運行,我們的工作人員到現場后才排查出的原因。
3. Before installing the two-component sealant dispenser, first check whether there is deformation, damage and fastener looseness caused by transportation and moving. Previously, a customer knocked off a part of the intelligent control system of the equipment in the process of moving the sealant dispenser, causing the equipment to fail to operate normally. Our staff found out the reason after arriving at the site.
4、我們可以根據地面平整度的實際情況來通過調整設備的可升降地腳螺栓來調整設備的水平度直到設備水平而穩固。然后按圖接線并可靠接地,把氣源接入機器所配帶的氣源接口,確保無漏氣現象。
4. First, we can adjust the levelness of the equipment according to the actual situation of the ground flatness by adjusting the lifting anchor bolts of the equipment until the equipment is horizontal and stable. Then connect the wires according to the diagram and connect the air source to the air source interface equipped with the machine to ensure that there is no air leakage.
5、向油槽中加注液壓油指定位置,46#液壓油(約為50升左右)。
5. Fill the oil tank with hydraulic oil to the designated position, 46 # hydraulic oil (about 50 liters).
6、接通電源并打開查看設備是否能夠正常運行。
6. Turn on the power and check whether the device can operate normally.
以上就是問題的解答了,您對此有什么不明白的地方,可以隨時來我們網站http://m.e846lbsv.cn咨詢!
The above is the answer to the question. If you don't understand anything about it, you can come to our website at any time http://m.e846lbsv.cn consulting service

上一篇:打膠機拉絲斷膠問題是什么情況引起的?
下一篇:如何才能保證打膠機的點膠精度?

  • 微信
主站蜘蛛池模板: 99久久电影| 麻豆亚洲 | 欧美精品三区 | 久久久久免费观看 | 久在线精品视频 | 欧美一区 | 日操操 | 国产精品精品久久久 | 日韩欧美国产精品一区二区三区 | 伊人精品一区二区三区 | 欧美日日| www国产亚洲精品久久网站 | 精品国产一区二区三区久久 | 激情一区二区三区 | 天天躁天天操 | 国产成人综合网 | 国产在线拍偷自揄拍视频 | 精品国产免费一区二区三区演员表 | 精品日韩在线 | 国产九九av| 日日夜夜狠狠操 | 欧美激情综合五月色丁香小说 | 秋霞精品 | 激情欧美一区二区三区中文字幕 | 欧美日韩国产在线观看 | 国产精品区二区三区日本 | 亚洲 欧美 激情 另类 校园 | 日本成人三级电影 | 在线观看h视频 | 一级片免费视频 | 91国内在线观看 | 成人婷婷| 亚洲欧美日韩高清 | 精品在线观看入口 | 欧美男人天堂 | 成人不卡一区二区 | 免费三级av | 亚洲精品久久久久avwww潮水 | 国产激情自拍视频 | 波多野结衣一二三区 | 在线亚洲免费视频 |